USS Sealion (SS-195)

From Wikipedia, the free encyclopedia

Jump to: navigation, search
USS Sealion (SS-195)
USS Sealion (SS-195)
Career USN Jack
Ordered:
Laid down: 20 June 1938
Launched: 25 May 1939
Commissioned: 27 November 1939
Fate: 10 December 1941-Wrecked and scuttled
Stricken:
General characteristics
Displacement: 1450 tons surfaced, 2340 tons submerged
Length: 310 feet 6 inch (95 m)
Beam: 27 feet 1 inch (8.3 m)
Draft: 13 feet 8 inches (4.2 m)
Propulsion:
Speed: 20 knots (37 km/h) surfaced, 8.75 knots (16 km/h) submerged
Range:
Complement: 55 officers and men
Armament: one three-inch (76 mm) gun; eight 21-inch (533 mm) torpedo tubes
Motto:

USS Sealion (SS-195), a Sargo-class submarine, was the first ship of the United States Navy to be named for the sea lion, any of several large, eared seals native to the Pacific.

Her keel was laid down on 20 June 1938 by the Electric Boat Company of Groton, Connecticut. She was launched on 25 May 1939 sponsored by Mrs. Claude C. Bloch, and commissioned on 27 November 1939 with Lieutenant J. K. Morrison Jr., in command.

Following shakedown, Sealion, assigned to Submarine Division 17 (SubDiv 17), prepared for overseas deployment. In the spring of 1940, she sailed, with her division for the Philippine Islands, arriving at Cavite in the fall to commence operations as a unit of the Asiatic Fleet. Into October of 1941, she ranged from Luzon into the Sulu Archipelago, then, with another submarine of her division, now SubDiv 202, she prepared for a regular overhaul at the Cavite Navy Yard. By 8 December (7 December east of the International Date Line), her yard period had begun; and, two days later, she took two direct hits in the Japanese air raid which demolished the navy yard.

The first bomb struck the after end of her conning tower and exploded outside the hull, over the control room. The second smashed through a main ballast tank and the pressure hull to explode in the after engine room, killing the four men then working there.

Sealion flooded immediately and settled down by the stern with 40% of her main deck underwater and a 15 degree list to starboard. The destruction of the navy yard made repairs impossible, and she was ordered destroyed. All salvageable equipment was taken off, depth charges were placed inside, and, on 10 December, the explosives were set off to prevent her from being made useful to the enemy.

See USS Sealion for other ships of the same name.

This article includes information collected from the Dictionary of American Naval Fighting Ships.

Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.