USS Proteus (AS-19)

From Wikipedia, the free encyclopedia

Jump to: navigation, search
Transfer of a Polaris Missile between Proteus & USS Patrick Henry (SSBN-599) at Holy Loch, Dunoon, Scotland, 1961
Transfer of a Polaris Missile between Proteus & USS Patrick Henry at Holy Loch, Dunoon, Scotland, 1961
Career USN Jack
Laid down: 15 September 1941
Launched: 12 November 1942
Commissioned: 31 January 1944
Decommissioned: 26 September 1947
Recommissioned: 8 July 1960
Decommissioned: September 1992
Fate: Laid up in the National Defense Reserve Fleet
General characteristics
Displacement: 9,734 tons
Length: 529 feet, 6 inches
Beam: 73 feet, 4 inches
Propulsion: diesel electric, twin screws, 12,000hp
Speed: 18.5 knots
Complement: 1,487
Armament: 4 single 5"/38 gun mounts, 8 40mm guns, 23 20mm guns

The third USS Proteus (AS-19) was a Fulton-class submarine tender in the United States Navy.

Contents

Proteus was laid down by the Moore Shipbuilding and Dry Dock Company, Oakland, California, 15 September 1941; launched 12 November 1942; sponsored by Mrs. Charles M. Cooke, Jr.; and commissioned 31 January 1944, Capt. Robert W. Berry in command.

After shakedown off San Diego, she stood out of San Francisco 19 March for Midway to tend submarines of Submarine Squadron 20. She arrived 3 May, and operating there until 1 December completed 51 voyage repairs and 14 refits for submarines. She returned to Pearl Harbor 4 December, and on 5 February got underway for Guam where she completed 4 voyage repairs and 24 refits by 7 August.

Assigned to occupation duty after the end of the war, Proteus rendezvoused with units of the 3rd Fleet and became the flagship of a 26 ship support group which steamed off the coast of Honshū until 26 August. On the 28th she anchored in Sagami Wan to begin supporting Submarine Squadron 20 as it demilitarized submarines, human torpedoes, torpedo carrying boats, and suicide boats at Yokosuka and other locations in the Sagami Wan - Tokyo Bay areas.

Also assigned to repair Japanese submarines, she remained until 1 November, when she headed home.

USS Proteus' complete war history summary is available at TenderTale: USS Proteus

Transiting the Panama Canal 6 December, she reached New London 16 December. A trip to the Canal Zone preceded cold weather operations with SubRon 8 at NS Argentia, Newfoundland during November, after which she returned to New London. Decommissioned and placed in service 26 September 1947, she provided vital service to the submarine base at New London until January 1959. On the 15th she entered Charleston Naval Shipyard for conversion to a tender for the Polaris Fleet Ballistic Missile submarines, including the addition of a 44-foot section amidships.

Proteus recommissioned 8 July 1960, and after shakedown at Guantanamo Bay, she accomplished her first SSBN refit 20 January21 February at New London. She then crossed to Holy Loch, Scotland arriving 3 March 1961. There for the next two years she completed 38 refits of Fleet Ballistic Missile submarines, for which she received the Navy Unit Commendation. Back at Charleston for overhaul in 1963, on 2 January 1964 she resumed operations at Holy Loch to provide support and refits to the Fleet Ballistic Missile submarines of Submarine Squadron 14.

On 24 February Proteus arrived at Rota, Spain, to establish the second overseas replenishment site for Fleet Ballistic Missile submarines, returning to Holy Loch 12 April. On 29 June she put in at Charleston and on 16 October was en route to Guam. Arriving Apra Harbor 29 November 1964, she established the third overseas replenishment site for the Fleet Ballistic Missile submarines. She continued to operate at Apra Harbor and in the Pacific for the next five years.

In 1974 in Guam, the remaining two obsolete 5" gun turrets and munitions were removed as unnecessary for her primary mission.

Proteus was decommissioned again in September 1992 and soon thereafter struck from the Naval Register. Two years later in 1994 Proteus was re-commissioned yet again as a Berthing Auxiliary and placed in service at Puget Sound Naval Shipyard, Bremerton, Washington. At this time Proteus took on the new naval designation Miscellaneous Unclassified IX-518.

In September 1999 the ship was placed out of active service and laid up at the National Defense Reserve Fleet at Suisun Bay, California.

Image:Uss proteus ribbons.bmp

  • Top Row - Navy Unit Commendation - Navy Meritorious Unit Commendation (2) - Navy Battle "E" Ribbon (4)
  • Second Row - American Campaign Medal - Asiatic-Pacific Campaign Medal, - World War II Victory Medal
  • Third Row - Navy Occupation Service Medal (with Asia clasp) - National Defense Service Medal - Humanitarian Service Medal (2)

Naval author Robert Clark Young worked as a civilian PACE Instructor on the Proteus during the summer of 1987, researching some of the material for his controversial book, One of the Guys.

Future actor Tony Curtis - whose birth name was Bernard Schwartz - was aboard USS Proteus at Tokyo Bay August - September 1945 - and watched much of the formal surrender activities aboard USS Missouri (BB-63) from Proteus' bridge.[1]

See USS Proteus for other ships of the same name.

This article includes text from the public domain Dictionary of American Naval Fighting Ships.

Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.