Lochaber narrow gauge railway

From Wikipedia, the free encyclopedia

Lochaber Narrow Gauge Railway
Locale Scotland
Dates of operation 1925 – 1977
Track gauge 3 ft (914 mm)
Length 25 miles
Headquarters Fort William


Lochaber Narrow Gauge Railway
Pier Head (Loch Linnhe)
Bridge over West Highland Railway
Bridge over A82 road
Base Camp / Factory
Portals
'Possil Park'
Adit 10
Bridge over The Cour
Shaft/Intake 7
'Central' (turning triangle)
Bridge over Allt Leachdach
Valve Shafts (Loch Treig)
Bridge over West Highland Railway
Fersit
Shaft C
Bridge alongside Laggan Dam
Roughburn Camp

The Lochaber Narrow Gauge Railway was a 3 ft (914 mm) gauge narrow gauge industrial railway. It was a relatively long line, built for the construction and subsequent maintenance of a 15 mile long tunnel from Loch Treig to a factory near Fort William in Scotland. The tunnel was excavated to carry water for the Lochaber hydro-electric power scheme in connection with aluminium production by the British Aluminium Company. The railway came to be known colloquially as the 'Old Puggy Line'.

Contents

The railway was initially built for the contractors Balfour Beatty to move workers and materials during construction of the tunnel. It was originally intended as a temporary feature.

Later, a decision was made to retain the railway for the delivery and despatch of materials and to assist with the maintenance of the tunnel.

The principal location on the railway was the factory area (or 'Base Camp' prior to its opening), where there were various facilities such as a locomotive and speeder shed. Some of the sidings here were of mixed gauge (3 ft gauge and standard gauge).

The railway as a whole comprised a network of lines as follows:

The Pier Railway ran from 'Base Camp' (near the factory site) to a pier on Loch Linnhe. It was built to enable construction materials to be brought in. Its length was 1¾ miles. It crossed over the West Highland Railway and the Mallaig Extension Railway of the LNER on separate bridges east of Mallaig Junction (as it was then known).

Later, a decision was made to retain the Pier Railway for the delivery of alumina and despatch of the finished aluminium ingots. The original railway, however, was not on a suitable alignment as it passed through the proposed site for Inverlochy village and also it crossed the A82 road on the level. Construction of a permanent Pier Railway commenced in 1927. It crossed the West Highland Railway on a bridge immediately west of Mallaig Junction. This bridge is still in situ.

It had been the intention that the permanent Pier Railway would be worked by electric traction, supplied by overhead wires, but this was never implemented. In addition, the bridges and embankments were built wide enough for double track, but the line remained single track throughout its life.

Bridge number 15 on the closed Upper Works Railway, photographed in 1995.
Bridge number 15 on the closed Upper Works Railway, photographed in 1995.

This was by far the longest part of the rail system, running for some 19 miles from Base Camp to the valve shafts located by Loch Treig. The first part of the railway climbed steeply for 4¼ miles at gradients of 1 in 30 or even 1 in 25. There were about 90 bridges on the line. Most of the bridges were originally timber trestles but all were subsequently rebuilt in steel using suitable scrap material from the factory. Near the middle point of the railway, at a location known as 'Central', there was a triangle for turning trains.

This was a short branch line that joined the Upper Works Railway close to Base Camp. It climbed to a height of 550 feet. Wagons were hauled by an electric winch at the top of the incline, which had a maximum gradient of 1 in 2½.

This branch connected with the Upper Works Railway and was ¾ mile in length.

This branch connected with the Upper Works Railway and was ½ mile in length.

This was a branch line some 3¼ miles in length. Built in 1930, it ran from a junction with the Upper Works Railway to Laggan Dam on Loch Laggan. The branch crossed over the West Highland Railway at Fersit on a 26-span timber trestle bridge. Much of the bridge was gradually filled in to form an embankment.

This branch connected with the Treig-Laggan Railway and was ½ mile in length.

In October 1971, heavy rainfall caused part of the Upper Works Railway to be washed away, leaving a gap of around 70 feet in the track. Following this event, the future of the railway had to be considered. At that time, the Forestry Commission was constructing many access roads in the area. It was therefore decided that further roads should be built, rather than repair the track. However, due to the length of time it took to achieve this, the railway continued to operate for a number of years. Two locomotives and two speeders had been stranded on the far side of the breach from the factory.

The railway finally closed in 1977.

Following closure of the railway, most of the track was lifted, but the steel bridges were mostly left in place. Some odd lengths of track remain in place, particularly on some of the longer bridges.

There has been talk of reopening part of the Upper Works Railway as a tourist attraction.[1]

  1. ^ Article in 'The Oban Times' dated 18 March 2005
  • Patrick Howat (1980). The Lochaber Narrow Gauge Railway, 1st. Edition, Famedram. ISBN 0 905489 43 8. 


Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.