Brokopondo Reservoir

From Wikipedia, the free encyclopedia

A map of Suriname showing the location of the Brokopondo Reservoir and its Dutch name.
A map of Suriname showing the location of the Brokopondo Reservoir and its Dutch name.

The Brokopondo Reservoir, also known by its alternate Dutch names, Prof. Dr. Ir. W.J. van Blommesteinmeer, and the Brokopondostuwmeer, is a large reservoir in the South American country of Suriname. It is named after the Javanese-born Dutch hydrological engineer Willem Johan van Blommestein. With a surface area of approximately 1,560 km² (602 mi²), depending on the current water level, it is one of the largest reservoirs in the world. It is located at 4°48′N 55°4′W.

The reservoir was created by constructing a dam across the Suriname River between 1961 and 1964. The dam spanning the river is 54 m (177 ft) tall, and is built near the small town of Brokopondo. Contrary to the reservoir's long official name, it was quickly rechristened Brokopondomeer by Dutch-speaking locals. The length of the dam, including secondary dams along the margins of the reservoir, is 12 km (7.5 mi). The watershed which feeds the reservoir is 12,200 km² (4,710 mi²) in area.

The reservoir was put into service in 1965, but did not reach its optimal water level until 1971. Due to the great area of the reservoir, villages home to approximately 5,000 people had to be abandoned. The largest of the these, the village of Ganzee, had approximately 2,000 residents. Most displaced residents simply founded new villages (Dutch: transmigratiedorpen) downstream from the dam, in many cases with the same names as the previously abandoned hamlets. A separate government operation, "Operation Gwamba," was conducted to save animals from the soon-to-be lake bed.

The dam was constructed in order to provide electricity to plants involved in the processing of bauxite into alumina, and later into purer aluminum metal. These plants were operated by Suralco, the Suriname Aluminum Company, which is a daughter company of Alcoa. About 75% of the dam's electricity was used to power these plants, and the portion of the electricity produced by the dam was used to power Suriname's capital city, Paramaribo. Other advantages of the dam's construction, besides a boost to the aluminum industry, have included the development of the country's inland areas and the surrounding forests, the pushing back of the saltwater boundary in the Suriname River, better irrigation capabilities during times of drought, an increase in tourist activity, and an increase in ease of fishing.

This article incorporates text translated from the corresponding German Wikipedia article as of 8 June 2006.

Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.